Davis Transmission Line Fabrication Shop ($12.3M) Total Size – 13,500 SF
•Ground up Construction of 9600 SF Shop and 3900 SF Office to support Electrical Transmission Tower Fabrication
•Site Improvements included Paving and Striping surrounding Yard for Storage
•Site Improvements included Paving and Striping surrounding Yard for Storage

Fairfield Information Operations Center ($14.2M) Total Size – 162,043 SF
• 14,000 SF Data Center Server Rack and Infrastructure Expansion
• 5,000 SF Security Operations Backup Control Center Upgrade
• 7,500 SF Emergency Network Operations Center and Office Renovation
• Infrastructure Upgrades including site Paving and MEP
• 5,000 SF Security Operations Backup Control Center Upgrade
• 7,500 SF Emergency Network Operations Center and Office Renovation
• Infrastructure Upgrades including site Paving and MEP

Picture2.jpg

Picture3.jpg

Concord East Bay Regional Center Upgrade ($25.3M) Total Size – 50,000 SF
• 34,584 SF Operations Building Tenant Improvement
• 9,400 SF Shop and Office Building Remodel
• 5,900 SF Shop and Warehouse Building Remodel
• 9,400 SF Shop and Office Building Remodel
• 5,900 SF Shop and Warehouse Building Remodel

San Rafael Service Center Upgrade ($22.5M)
Total Size – 446,054 SF
• 12,500 SF Weld Shop Upgrade
• 13,640 SF Vehicle Maintenance Upgrade
• Full Site Paving, Perimeter Security, and Technology Upgrades
• 13,640 SF Vehicle Maintenance Upgrade
• Full Site Paving, Perimeter Security, and Technology Upgrades

Oakland East Bay Regional Center Upgrade ($8.2M) Total Size – 25,031 SF
• 15,091 SF Operations Building tenant Improvement including office space, restrooms, conference room and break area for (2) buildings on campus.
• Site Perimeter Security, Technology, and Underground Infrastructure Upgrades
• Site Perimeter Security, Technology, and Underground Infrastructure Upgrades

VCOC.jpg

VCOC inside.jpg

Davis Transmission Line Fabrication Shop ($12.3M)
Total Size – 13,500 SF